-
Notifications
You must be signed in to change notification settings - Fork 190
Pull requests: scylladb/scylla-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Increase CPU requests in E2E's ScyllaDBCluster template
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
kind/failing-test
Categorizes issue or PR as related to a consistently or frequently failing test.
lgtm
Indicates that a PR is ready to be merged.
priority/important-soon
Must be staffed and worked on either currently, or very soon, ideally in time for the next release.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#2847
opened Jul 30, 2025 by
rzetelskik
Loading…
Grant Operator finalizer update permission on ScyllaDBClusters and RemoteKubernetesClusters
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
kind/cleanup
Categorizes issue or PR as related to cleaning up code, process, or technical debt.
lgtm
Indicates that a PR is ready to be merged.
priority/important-soon
Must be staffed and worked on either currently, or very soon, ideally in time for the next release.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#2843
opened Jul 30, 2025 by
zimnx
Loading…
1 task done
Bump the gomod group with 8 updates
area/dependency
Issues or PRs related to dependency changes
kind/dependency-bump
Categorizes issue or PR as a dependency update.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
priority/important-longterm
Important over the long term, but may not be staffed and/or may need multiple releases to complete.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#2840
opened Jul 30, 2025 by
dependabot
bot
Loading…
Explicitly set and unify the number of retries and backoff duration in ScyllaDB Manager tasks in E2E tests
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
kind/flake
Categorizes issue or PR as related to a flaky test.
lgtm
Indicates that a PR is ready to be merged.
priority/important-soon
Must be staffed and worked on either currently, or very soon, ideally in time for the next release.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#2834
opened Jul 28, 2025 by
rzetelskik
Loading…
[WIP] Add comprehensive Manager documentation
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/needs-kind
Indicates a PR lacks a `kind/foo` label and requires one.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-priority
Indicates a PR lacks a `priority/foo` label and requires one.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#2777
opened Jul 15, 2025 by
mflendrich
•
Draft
Update helm templates for operator and manager to support custom namespace
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/needs-kind
Indicates a PR lacks a `kind/foo` label and requires one.
needs-priority
Indicates a PR lacks a `priority/foo` label and requires one.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#2755
opened Jul 7, 2025 by
debMan
Loading…
[WIP] Bump ScyllaDB version to 2025.2.0
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/needs-kind
Indicates a PR lacks a `kind/foo` label and requires one.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-priority
Indicates a PR lacks a `priority/foo` label and requires one.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#2721
opened Jun 26, 2025 by
zimnx
Loading…
Add CQL Client-Node TLS enhacement to multi-datacenter clusters
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
kind/design
Categorizes issue or PR as related to design.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
priority/important-longterm
Important over the long term, but may not be staffed and/or may need multiple releases to complete.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#2688
opened Jun 10, 2025 by
zimnx
Loading…
Disabled XFS rmapbt and reflink flags for reducing overhead
do-not-merge/needs-kind
Indicates a PR lacks a `kind/foo` label and requires one.
lifecycle/rotten
Denotes an issue or PR that has aged beyond stale and will be auto-closed.
needs-priority
Indicates a PR lacks a `priority/foo` label and requires one.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#2562
opened Mar 25, 2025 by
gnana997
Loading…
ProTip!
Follow long discussions with comments:>50.