added license header - test. #327
main.yml
on: pull_request
Matrix: main-linux / tox
Matrix: main-windows / tox
main-linux
/
collector
2s
main-windows
/
collector
4s
Annotations
10 errors
main-linux / ubuntu-latest / py311
Process completed with exit code 2.
|
main-linux / ubuntu-latest / py310
The operation was canceled.
|
main-linux / ubuntu-latest / py310
The strategy configuration was canceled because "main-linux.tox.py311" failed
|
main-linux / ubuntu-latest / py312
The operation was canceled.
|
main-linux / ubuntu-latest / py312
The strategy configuration was canceled because "main-linux.tox.py311" failed
|
main-linux / ubuntu-latest / py39
The operation was canceled.
|
main-linux / ubuntu-latest / py39
The strategy configuration was canceled because "main-linux.tox.py311" failed
|
main-linux / collector
Process completed with exit code 1.
|
main-windows / windows-latest / py39
Process completed with exit code 1.
|
main-windows / collector
Process completed with exit code 1.
|